Telephone 01383 428999 Email info@steelbuildingsdesign.co.uk
Supplying & Erecting Bespoke Steel Buildings Throughout the UK
Case Studies

Below are some case studies from our clients who we have worked with. We have worked with hundreds of clients throughout the UK

 
Home About Us Case Studies Testimonials Our Gallery Services Buildings Faq/Tech Info Contact Us
Case Studies

Neil Wells (Buchlyvie): We were approached by the customer, who had spoken with various steel building suppliers regarding the supply of a hanger for personal use. The concept we came up with offered both the most suitable design idea and most cost effective solution for the customer creating the perfect steel building solution for his needs.  The design concept for this bespoke building can be replicated to suit any location within the UK and offers very easy to use and wide opening sliding doors.

 

Marlow Foods (Quorn): As preferred supplier to the main contractor we designed and supplied a steel building solution for the manufacturers of Quorn products.  Very limited access and erecting our structure over existing equipment meant this steel building erection had to be very carefully planned where health and safety was paramount.  Our erection method proved to be unique in this instance meaning that we could complete the required work within seven days of arriving onsite.  Our industrial steel buildings can be tailored to meet any building requirement.

 

HMP Coldingley (Woking): I bet our erection teams didn’t think they would be spending time inside! Her Majesty’s Prison Coldingley had a requirement for both recreation and storage.  As the recommended supplier to the main contractor we were able to work within the prison yard area to quickly and efficiently erect our steel structure which the customer was delighted with, gaining the nickname ‘Hanger 18’.  Once security cleared our erection team carried out the erection work in less than ten days meaning that disruption to the prison was minimal.

 

Newlife Fitness (Laurencekirk):  An exciting opportunity came up for a customer in the town of Laurencekirk near Aberdeen this year, as he embarked on a journey to open and operate a state of the art multi gym. We took on his steel building design here and worked closely with him and our engineers, to ensure what was being designed would comply with steel and construction industry standards. Promoting fitness and well being we were never going to cause any extra stress and the customer is extremely happy with the end result. Looking good!

 

Philip Rowe (Wiltshire): A triple garage requirement where the central bay area allowed for access with a higher vehicle was the spec. A simple steel building solution was designed using our award winning design software, delivered and erected within four weeks.  The customer was delighted with the finished product and impressed at how quickly the process was from start to finish.  Speak to us about our cost effective steel garages which can be erected within four weeks of ordering.

 

Vehicle Certification Agency (Nuneaton): Our cold rolled steel structure was ideal for creating a fully Insulated building  which could be used for testing bays for VCA.  The roller doors had large enough for HGV entry yet strong enough to withstand the elements, this is something that many suppliers forget, we work with four separate roller door and sectional door manufacturers to ensure that our steel buildings are both the most cost effective in the UK but also the correct solution for each requirement.

 

 
Click here to download
A Free Brochure
Click here to read our
Clients Testimonials
Contact us today to speak with one of our experienced and friendly staff who will be more than happy to help. 01383 428999